Currency, unit and quantity
Record the quoted amount, currency, mass unit, MOQ, quantity band, quote date and validity. If converting currency, record the rate, source and date separately.
Buyer comparison worksheet
Normalize the currency, unit, product stage, delivery rule and named place. Then show which testing, finishing, certification/release, transport and other work is included, excluded or still unpriced.
For licensed and otherwise authorized commercial operators. Not for patients or consumers. Print-friendly; not legal, tax, customs, regulatory, quality, medical or financial advice.
Comparison rule
A quote becomes decision-useful only when its denominator, delivery stage and unresolved costs are visible.
Record the quoted amount, currency, mass unit, MOQ, quantity band, quote date and validity. If converting currency, record the rate, source and date separately.
Distinguish starting material, intermediate and finished stage. State which processing, packaging, testing and certification/release work remains after the quoted handoff.
An Incoterm without its version and precise named place is incomplete. It also does not by itself settle title, payment, regulatory responsibility or product acceptance.
Do not create a false landed-cost total. Keep unresolved duties, taxes, permits, insurance, special transport, testing, finishing, release, rejection and return costs visible as “unpriced” until the responsible party supplies a usable basis.
Cost stack
Product stage, lot status, quantity band, packaging state, price unit and quote validity.
Sampling, laboratory panels, treatment, conversion, packaging, relabelling, storage and rework.
Permits, responsible importer/manufacturer, batch certification or release, destination testing and document review.
Origin handling, freight, controlled transport, insurance, customs handling, duties/taxes and final delivery.
Use one column per supplier quote. Enter “included,” “excluded,” “unpriced” or the sourced amount. Do not insert supplier identities or confidential reference numbers if the worksheet will circulate outside the authorized team.
One buyer requirement · up to three coded quotes · use a common currency, unit and delivery stage only after every conversion and assumption is recorded.
Swipe horizontally to compare all three coded quotes →
| Comparison field | Quote A | Quote B | Quote C |
|---|---|---|---|
| Quote source and validityDate, issuer/source, valid-through date | |||
| Product + lot stateStage, lot/current capability, MOQ, allocable quantity | |||
| Quoted amount / basisAmount, currency, unit, quantity band | |||
| Incoterm + version + named placeExact point, not the three-letter rule alone | |||
| TestingOrigin/destination sampling, lab panels, retests | |||
| Finishing + packagingTreatment, processing, conversion, pack, label, storage | |||
| Certification / releaseResponsible party, work included, destination requirements | |||
| Transport + insuranceOrigin handling, freight, special controls, final delivery | |||
| Customs, duties, taxes + permitsResponsible party and known amounts | |||
| Payment / inspection / rejectionTiming, acceptance point, rejected goods and returns | |||
| Unpriced items + assumptionsList every missing cost; do not bury it in a total | |||
| Normalized viewComparable cost only if basis is supportable; otherwise “incomplete” |
Primary-source checks
Commercial-term limit: an Incoterm addresses defined delivery obligations; it does not replace the transaction’s regulatory, quality, title, payment, inspection, acceptance, rejection or dispute terms. Obtain transaction-specific professional advice.
Need a focused screen?
Provenance can identify a small number of credible anonymous capabilities and make the decisive gaps visible.